Norwich Roofers installs new roofs for homeowners in North Walsham, and if you are dealing with a failing roof right now, knowing what to do in the short term - and what not to touch - can prevent a manageable problem from becoming a far more serious one.
A full new roof is not something that can be arranged and completed overnight. There is a survey to carry out, a specification to agree, materials to order, and scaffolding to erect before a single tile comes off. In the meantime, you may be dealing with an active leak, missing tiles after a storm, or a flat roof membrane that has given up. What you do - and do not do - in the days or weeks between identifying the problem and the contractors arriving matters.
If you have an active leak, locate where water is entering the building as accurately as you can from inside. A water stain on a ceiling is rarely directly below the entry point - water travels along rafters, ceiling joists, and underlay before dropping. Go into the loft during or immediately after rain if it is safe to do so, and note where the drips or wet patches are appearing on the underlay or timbers. Photographs with a timestamp are useful for the roofer and for any insurance claim.
Contact a roofer promptly. Many will carry out emergency patch repairs to make a roof watertight while a full replacement is planned. This is not a long-term fix, but it buys time without letting water continue to penetrate the structure.
If water is coming in and you cannot stop it immediately from above, the priority is limiting damage inside the property.
The most important rule is straightforward: do not go onto the roof yourself. This applies whether the roof is pitched or flat. A roof that is already in a poor state of repair may have soft spots, rotten battens, or compromised structural timbers that are not apparent from the surface. A person's weight in the wrong place can cause a fall through the roof, a fall from the roof, or both. Falls from height are among the most common causes of serious injury in domestic DIY.
Beyond the personal safety risk, walking on tiles or a deteriorated flat roof membrane often causes additional damage - cracking tiles, dislodging others, or splitting a membrane that was still partially intact. The damage from an unplanned visit to a roof can exceed the cost of the temporary repair a professional would have made.
Similarly, avoid:
If a roofer can attend before the full replacement is ready to begin, the most effective interim measures are:
A properly weighted tarpaulin over a storm-damaged area can keep a property watertight for several weeks. It is not a cosmetic solution, but it is effective and safe. Insist that any tarpaulin is secured properly - a loose tarp in wind causes as much damage as it prevents.
Understanding the sequence of a new roof installation helps you plan around it and know what to expect. Scaffolding goes up first and typically takes a day. The existing covering is stripped back to the timber - a process that generates significant debris, so skips are positioned before stripping begins. The exposed timber structure is inspected; rotten rafters or sarking boards are replaced before anything new goes on.
New breathable underlay is then fixed to the rafters, followed by treated battens at the gauge specified for the tile or slate being used. Tiles or slates are loaded and laid from eaves to ridge. Ridge tiles are fixed last, either in mortar or with dry-fix clips and a ventilated ridge system. Flashings are dressed at chimneys, abutments, and any rooflights. Guttering is refitted or replaced.
For flat roofs, the process involves inspecting and repairing or replacing the deck before any new membrane goes on. Laying a new EPDM or built-up felt system over a damaged deck is one of the most common reasons flat roofs fail within a few years of replacement. A good contractor will not skip this step.
While scaffolding is in place, guttering and fascia replacement costs far less than it would as a separate job later. If your guttering is old, cracked, or pulling away from the fascia, having it replaced during the re-roof is the economical choice. The same applies to any rooflight or skylight you have been thinking about adding - the structural opening and kerb work are part of the same operation as stripping and re-tiling, and the additional cost is significantly lower than returning to the property after scaffolding has come down.
We cover North Walsham and the surrounding area for new pitched and flat roof installations, including emergency temporary repairs to make properties watertight while the full replacement is planned. If your roof is failing, call us for a survey so we can tell you what is needed and what can be done in the meantime.