If you need lead work carried out in Mattishall, knowing how to choose the right roofer and what to ask before any work starts can save you money, stress, and a repeat call-out.
Call any time. Calls are answered day and night and passed straight to our roofers.
Lead is used on roofs wherever two surfaces meet or wherever water needs to be directed away from a junction. Flashings seal the join between a chimney stack or a wall and the roof covering. Valleys channel rainwater down between two roof slopes. Soakers sit underneath slates or tiles at abutments, tucked in course by course, and work alongside step flashings. On some older properties, lead forms the whole covering of a flat or low-pitched roof section.
When lead work fails, water finds a way in. A small gap in a flashing, a crack caused by thermal movement, or lead that was never properly dressed into a mortar joint can let water track down inside a wall or ceiling for weeks before you notice a stain. By then, the damage to timbers, insulation and plasterwork can be considerably worse than the original roofing cost.
We carry out all types of lead work to traditional standards using code-appropriate lead sheet. Code 3 is standard for soakers and small flashings. Code 4 is the most common choice for chimney flashings and general roof junctions. Code 5 and above is used for valleys and flat sections where the sheet has to carry more standing water. Using the right code for each application is not a minor detail; undersized lead is one of the most common reasons lead work fails prematurely.
Poorly fitted lead can be a cause of roof leaks. A number of things cause it to fail, and understanding them helps you ask better questions when you are getting quotes.
Choosing the right roofer for lead work is worth taking time over, because the difference between a good job and a poor one is not always visible from the ground once the scaffolding comes down. The questions below are the ones worth asking before you agree to anything.
Any roofer who does lead work regularly should be able to show you photographs of completed jobs. You are looking for neatly bossed corners, consistent patination oil finish to inhibit white carbonate staining, and lead dressed tight to every surface with no gaps or lifted edges. If a contractor cannot show you any examples, that tells you something.
A contractor who knows their trade will answer this without hesitation. For a standard chimney flashing, you should hear "code 4" without prompting. If the answer is vague, or if they say it depends on what they have in the van, consider that a warning sign. The specification should be decided before the job starts, not on the day.
The correct method is to cut a chase into the mortar joint using an angle grinder, fold the top edge of the lead into the chase, and secure it with lead wedges before pointing up with a flexible, weather-resistant mortar or sealant. If a contractor mentions simply bedding the lead in mortar without cutting a chase, the repair will not last.
Listen for mention of section lengths, expansion joints, or fixing methods that allow movement. On a valley or flat section, this is especially important. A contractor who addresses this unprompted is showing genuine knowledge of the material.
Lead work does not exist in isolation. A flashing around a chimney sits next to slates or tiles. If those tiles are cracked, loose or have failed nibs, water will still get in even after new lead is fitted. A good roofer will check the surrounding area and tell you honestly what else needs attention, rather than just completing the lead job and leaving.
You want to see what code of lead is being supplied, what length of flashing is being renewed, whether scaffolding or access equipment is included, and what the pointing up involves. A total figure with no detail makes it impossible to compare quotes fairly or to hold anyone to account if the job is not done as described.
Most lead work on chimney stacks, abutments or parapet walls requires scaffolding or a mobile elevated work platform. Clarify before you agree who organises this, whose responsibility it is to ensure it is safe, and whether its cost is already included in the quote. Scaffold hire can add several hundred pounds to a job if it is priced separately.
Before any new lead is fitted, the old material and any failed pointing should be removed completely. Trying to bed new lead over old, cracked lead or crumbling mortar is a shortcut that always shows up later as a repeat leak. The surface beneath needs to be clean and sound.
Lead sheet is cut to size and then worked by hand to fit the profile of the roof. On a chimney, the back gutter is usually fitted first, then the side step flashings, then the front apron. Each section is fixed independently and lapped correctly before pointing. The whole process on a standard chimney stack typically takes most of a day, sometimes two if the brickwork needs significant repointing work alongside the lead.
Once the lead is dressed and fixed, patination oil is applied to the surface. This is not cosmetic. It prevents the white lead carbonate run-off that can stain brickwork and tile below, and it slows the initial weathering process. It is a small step that a thorough contractor will not skip.
After the work is complete, ask the contractor to walk you through what was done. If they cannot access your roof easily to show you, photographs taken during the job are a reasonable alternative. You should be able to see the chase joints, the section breaks, and the overall finish before you make final payment.
A lead valley runs along the internal angle where two roof slopes meet and carries a significant volume of water. Because it is constantly wet during rain, and because water can back up if leaves or moss block it, the specification needs to be right. Code 5 lead is the standard minimum for an open valley. The sheets need to be wide enough to allow for splash and carry water clear of the tile edges, and the section lengths and fixings need to account for the greater thermal movement a valley experiences compared with a flashing.
Some valleys are "closed" using tile-and-a-half slates or purpose-made valley tiles, which eliminates the lead entirely. Whether this is appropriate depends on the roof pitch, the tile type and the volume of water the valley needs to handle. A roofer who can discuss both options and explain the pros and cons for your specific roof is more useful than one who defaults to whichever they find easier.
Chimneys are a common location for lead work repairs. A typical chimney will have a back gutter (a tray of lead behind the stack that catches water running off the rear slope), two sets of step flashings running up each side, and a front apron across the lower face. All four elements need to work together. Replacing just one without checking the others is a false economy if the adjacent flashings are also near the end of their life.
On older properties, you may also find that the chimney has a lead flaunching cap or a lead-lined pot. These are less common but worth checking if the stack has not been inspected for some years. Cracked flaunching lets water into the stack core, which can cause internal damp that is often mistaken for condensation.
Lead has been used to cover flat and low-pitched roof sections for centuries. It is a durable, malleable material that, when properly specified and fitted, can outlast almost any alternative. For bay window tops, small extensions, dormers and porches, lead is often the most practical traditional option. EPDM rubber membrane is a modern alternative worth considering for larger flat areas where the weight of lead becomes a factor, but for smaller sections on traditional properties, lead remains a sound choice.
A lead flat roof needs falls built into the structure beneath it to ensure water drains away rather than ponding. If the structure has settled or was built with insufficient fall, the lead covering alone cannot solve the problem. A roofer quoting for a flat roof replacement should assess the fall and advise on whether any structural work is needed before the new covering goes on.
Lead work costs vary significantly depending on the scope and access required. As a general indication, re-leading a standard chimney stack in Norfolk typically costs in the range of £400 to £900 for the lead work itself, with scaffolding on top of that if required. A lead valley replacement on a typical semi-detached or detached house might run from £600 to £1,500 depending on length and access. Flat roof lead covering for a bay or small extension can range from £800 to several thousand pounds depending on the area covered.
These are current typical figures, not fixed prices, and any quote you receive should reflect the specific materials, access and preparatory work involved in your job. Be cautious of quotes that are very significantly lower than others without a clear explanation of what has been left out.
As well as Mattishall, we carry out lead work for homeowners across the surrounding area. We also work in areas like Thorpe St Andrew, Costessey and North Walsham.
If you have a suspected lead flashing failure, a chimney leak, or a valley that is showing its age, call us to arrange a roof survey. We will inspect the detail, explain exactly what needs doing and why, and give you a written breakdown so you can make an informed decision. There is no obligation to proceed, and we will tell you honestly if a repair is the right call rather than a full replacement.
No obligation · We'll call you to arrange a free visit