Urgent leak or storm damage? Call 01603 361301 - answered day and nightUrgent leak? Call 01603 361301
Norwich Roofing Specialists
01603 361301 Get a Quote →

Flat Roofing in Swaffham - How the Job Works From Start to Finish

If you've never had a flat roof replaced before, knowing what to expect at each stage helps you make sure the work is being done properly on your home in Swaffham.

Urgent leak or storm damage?

Call any time. Calls are answered day and night and passed straight to our roofers.

Call now: 01603 361301
Flat Roofing · Swaffham

Expert Flat Roofing
in Swaffham

What We Do

Norwich Roofers installs and repairs flat roofs on extensions, garages and commercial buildings in Swaffham and across Norfolk. We use EPDM rubber membrane systems and torch-on felt depending on the application and the customer's requirements. Every job starts with a survey and ends with a written specification. This page walks through what a full flat roof replacement looks like from the first visit to the day we pack up and leave.

Stage 1 - The Initial Survey

Before anything else, the roof needs to be properly assessed. This is not a 30-second look from the ground. A thorough flat roof survey involves getting onto the roof and examining the membrane, the deck, the falls, the drainage outlets, and all the upstand junctions where the membrane meets walls or parapets.

During the survey we check whether the deck is sound. We press the surface to feel for soft spots that indicate the boarding beneath has absorbed moisture. If the old membrane has been leaking for some time, the deck can be compromised even when the top surface still looks intact. A roofer who skips the deck check and quotes purely on the membrane area is not giving you the full picture.

We also check the falls. British Standard guidance calls for a minimum fall of 1:80 on a flat roof. If water is pooling and the falls are insufficient, re-covering without correcting the falls just delays the same problem. Sometimes the fall can be improved by building up the deck on one side; sometimes it requires a more substantial rework. Either way, you should know about it before the job starts.

The survey is also when we note the position and condition of outlets, gutters and downpipes. A new membrane will not perform well if the drainage is blocked or poorly located.

Stage 2 - The Written Specification and Quote

After the survey, we produce a written specification that sets out exactly what we are going to do: the membrane system, the deck boarding specification if needed, the upstand heights, the flashing details, and the drainage arrangement. The price in the quote is tied to that specification, not to a verbal description of the job.

A written specification matters because it protects you. If a roofer gives you a verbal quote and later charges extra for the deck replacement you never discussed, you have no comeback. If you have it in writing, you do. Before accepting any flat roof quote, ask for a written specification and read it carefully.

Stage 3 - Stripping the Old Roof

On most replacement jobs, the first thing on site is stripping the old membrane back to the deck. This gives us a clear view of what we are working with and allows us to identify any deck sections that need replacing. Overlaying a new membrane on top of an old one is sometimes done but it is generally not best practice: you are trapping whatever moisture is in the old build-up and adding weight to the structure.

Stripping a felt roof produces a reasonable volume of waste material. A professional crew will dispose of this properly; check with any roofer you appoint whether waste disposal is included in the price and how they handle it.

Stage 4 - Deck Inspection and Replacement

Once the old membrane is off, the deck is inspected in detail. On a domestic extension or garage, the deck is usually plywood, chipboard or old timber boarding. Plywood is the preferred material for re-decking because it is stable and moisture-resistant.

Any boards that are soft, delaminated or swollen with moisture are cut out and replaced. The replacement boarding is fixed firmly to the joists below, with no movement or flex. A deck that moves under foot is a sign that fixings are insufficient or joist spacing is too wide for the board thickness being used.

The deck surface needs to be smooth and free from projecting fixings before the membrane goes down. Any screw or nail head that sits proud of the surface will eventually telegraph through the membrane and become a stress point.

Stage 5 - Fitting the Drip Edge and Verge Trim

Before the main membrane is laid, a drip edge or fascia trim is fitted around the perimeter of the roof. This metal trim, typically aluminium or galvanised steel, forms a neat edge and channels water into the gutter rather than allowing it to run back under the deck. Getting this detail right matters: if water tracks back along the soffit, it rots the fascia board and the rafter ends.

The trim is fixed to the deck edge and the membrane is then bonded over and down onto it. This creates a continuous, sealed edge all the way round the roof.

Stage 6 - Laying the Membrane

For EPDM jobs, the membrane is cut to size from the roll and laid out dry across the deck to allow it to relax and lose any memory from being wound up. This relaxation period prevents the membrane from pulling tight against bonded edges once the adhesive is applied.

The contact adhesive is applied to both the back of the membrane and the deck surface. When both surfaces are touch-dry, the membrane is folded back carefully and pressed into position. It is rolled firmly across the whole surface to remove air pockets and ensure full contact with the adhesive. Any trapped air under the membrane is a future failure point.

For torch-on felt, the process is different: the felt is progressively unrolled and the bitumen is torched until it becomes fluid, bonding the felt to the primer-coated deck as it goes. Laps between sheets are torched separately to form a waterproof seal.

Stage 7 - Forming the Upstands

Where the roof membrane meets a wall, it must turn up and bond to the vertical surface to a height of at least 150mm. This upstand is one of the most critical details on the whole roof. If it is too short, wind-driven rain gets behind it. If it is not bonded properly to the wall, it peels back.

On an EPDM roof, the upstand is formed using the same rubber membrane, bonded with contact adhesive and secured with a compatible termination bar that is fixed to the wall and sealed at the top edge. The bar is then dressed with lead or capped with a purpose-made flashing that is pointed into the mortar joint above.

This detail is where shortcuts are most commonly taken. Mastic alone is not a long-term solution for terminating an upstand. It bonds well initially but hardens and loses adhesion over a few years.

Stage 8 - Drainage Outlets and Finishing Details

Drainage outlets are fitted or cleaned out and the membrane is bonded around them using the appropriate collar or flange detail. A poorly sealed outlet is a straightforward leak waiting to happen.

Any roof lights, pipes or other penetrations are dealt with using pre-moulded EPDM collars or formed details, bonded with the same adhesive system as the main membrane. Each penetration is a potential weak point if not detailed correctly.

Stage 9 - Final Inspection and Clean-Up

Once the membrane, upstands and all details are complete, the roof is inspected thoroughly. We check that the falls are directing water to the outlets, that no air pockets remain in the membrane, that all upstands are securely bonded and that all flashings are properly dressed.

All waste material from the job is cleared from the site. Gutters are checked and cleared of any debris from the works. You should be able to walk away from any flat roofing job with a clean site and a roof you do not have to think about again for many years.

Arrange a Survey in Swaffham

If you have a flat roof on an extension, garage or outbuilding in Swaffham that needs attention, call Norwich Roofers to book a survey. We will walk through the condition with you and put together a full written specification before any work starts.

Why choose Norwich Roofers?

  • Free survey and itemised quote
  • Fixed price - no surprises
  • Local team

Get your free quote

No obligation · We'll call you to arrange a free visit

By submitting you agree to being contacted about your enquiry. No spam, ever.

Urgent leak or storm damage?

Call any time. Calls are answered day and night and passed straight to our roofers.

Call now: 01603 361301