Exterior Cladding in Swaffham - The Job Step by Step, from First Look to Clean-Up

If you are planning exterior cladding on your Swaffham home and want to know exactly what the job involves from the first visit to the day we pack up and leave, this page walks you through it.

Urgent leak or storm damage?

Call any time. Calls are answered day and night and passed straight to our roofers.

Call now: 01603 361301
Exterior Cladding · Swaffham

Expert Exterior Cladding
in Swaffham

Why knowing the process matters

Cladding is not a small job. It involves stripping back the existing wall finish, working at height, and making decisions about materials and detailing that will affect your home for twenty years or more. Homeowners who understand what a proper job looks like are in a much better position to ask the right questions and spot whether a contractor is cutting corners.

We install and replace exterior cladding on homes in Swaffham and across Norwich. Here is what a properly run cladding job looks like, from the first conversation to the final clear-up.

Step 1 - The initial survey

Before any price is agreed, the wall needs to be looked at properly. That means checking what is already on the wall and what is behind it. If there is existing cladding, we lift boards at the edges and corners to inspect the battens, the breather membrane and the wall surface underneath. If the wall is bare masonry or render, we check for existing damp or cracking before designing the new system on top of it.

We also look at the junctions - where the wall meets window and door frames, where it meets the soffit above, and where it meets ground level or a damp-proof course. These are the places where water most reliably finds a way in, and getting the detailing right at these points matters as much as the boarding itself.

Anyone who prices a cladding job from a quick glance and a tape measure is guessing at what the prep work will involve.

Step 2 - Agreeing the scope and materials

Once we have seen the wall, we can have a proper conversation about what the job involves and what the options are. For most homes in Swaffham, the main material choices are uPVC, timber or composite boarding. Each has different maintenance requirements, cost points and appearances. We explain what suits the property and the budget, and we do not push a single option.

We also agree what happens with the prep work. If the existing battens are sound, we can re-use them. If they have any rot or the fixing centres are wrong for the new boards, they need to come out. This is not something that can be confirmed until the old cladding is off, so a reputable contractor will explain this possibility in advance rather than hitting you with it as a surprise extra once the job has started.

Step 3 - Setting up and stripping back

The job starts with setting up scaffolding or access equipment appropriate for the height of the wall. For a single-storey elevation, tower scaffold or platform steps are often sufficient. Two-storey work needs a proper scaffold, and for most houses that means a one-bay or two-bay tube-and-fitting scaffold tied to the wall. This is not the place to work from a ladder - cladding work requires both hands and a stable platform.

Once access is in place, the existing cladding comes off. We remove boards in sections, taking care not to damage window frames, soffits or any adjoining surfaces. Old fixings are extracted rather than broken off, because broken fixings left in the batten framework cause problems for the new fixings going in next to them.

Step 4 - Inspecting and preparing the substrate

With the old cladding off, the wall is inspected fully. Any damaged or rotten batten is marked for replacement. The breather membrane behind is checked for tears or gaps - a membrane that has been in place for fifteen or twenty years often needs replacing because the material becomes brittle and loses its water-resistance. If the wall itself has mortar joints that have opened up or render that has come away, those are repaired now before anything goes back on top.

New treated timber battens are fixed at the correct centres for the board size and weight being installed. The batten thickness creates the ventilated cavity behind the cladding - typically a minimum of 25mm clear air gap. This gap is not optional. It is what allows the system to breathe and prevents moisture from becoming trapped.

Step 5 - Fitting the cladding

Boards go on from the bottom up, starting with a starter strip or the first full board set at the correct height above ground or above the damp-proof course. Each board is fixed at the correct spacing for the material - uPVC and composite boards need room to expand in warm weather, so fixings go into pre-drilled or slotted holes rather than tight into solid board.

Corners are detailed using purpose-made corner trims or mitred boards, depending on the material and the look agreed. Around windows and doors, the boards are cut to fit tightly against the frame, then finished with a sealant joint using an appropriate flexible sealant. This joint is what keeps wind-driven rain from tracking behind the boards at the frame edge, so it needs to be applied properly and tooled to a clean finish.

Horizontal joints between boards use the correct overlap for the profile and the exposure of the site. A poorly detailed horizontal joint is one of the most common routes for water ingress in domestic cladding.

Step 6 - Flashings and junctions at the top

Where the cladding meets the soffit or the eaves, a top flashing or trim is fitted to close the cavity at the top while still allowing air to circulate. This is a detail that is sometimes omitted on rushed jobs, leaving an open gap at the top of the wall that lets in both water and vermin. The batten cavity needs to be open enough to breathe but detailed to prevent water entry.

Any other penetrations through the cladding - external tap bosses, airbricks, cable routes - are also detailed with appropriate collars or sealant at this stage.

Step 7 - Final check and clean-up

Before scaffolding comes down, we walk the elevation and check every board, corner, joint and sealant line. Any board that is not sitting correctly, any sealant line that has pulled away, any fixing that is proud of the surface - these are dealt with while access is still in place. It is much harder to correct a problem after the scaffold has been struck.

Once we are satisfied, scaffolding is dismantled and removed. All waste boards, packaging and off-cuts are loaded and taken away. The site is left clean. Window frames and surrounding surfaces are wiped down if they have picked up any dust or sealant smears during the work.

How long does a cladding job take?

The programme depends on the size of the wall, the amount of prep required and the material chosen.

Book a survey for your Swaffham property

If you want to know exactly what your cladding job will involve and what the prep conditions look like on your specific wall, call us to arrange a survey. We will walk you through what we find, what the work will involve and what the options are. Call Norwich Roofers to book your cladding survey in Swaffham.

Why choose Norwich Roofers?

  • Free survey and itemised quote
  • Fixed price - no surprises
  • Local team

Get your free quote

No obligation · We'll call you to arrange a free visit

By submitting you agree to being contacted about your enquiry. No spam, ever.

Urgent leak or storm damage?

Call any time. Calls are answered day and night and passed straight to our roofers.

Call now: 01603 361301